Sample traceability

Sample traceability and change history

Starting from the proposal, the system shows the contract, work orders, samples, parameters and reports linked to each other. Each sample has a timeline, and result changes keep the previous value, the user and the date.

app.gerencialab.com.br
Ordem de Serviço · Consumíveis e equipamentosDemo · sample data
TipoItemLote / Cód.EscopoStatus
LabReagente ÁcidolotePor OSConcluído
ColetaLuva00000001202Por DiaConcluído
Equip.pHmetro portátilEQ 535Por DiaConcluído
Equip.Micropipeta 1000µLEQ 289Por OSConcluído
Cada item preso à OS, com lote e validade

Illustrative system screen. Demo data that does not represent client results.

What you'll find in this area

From proposal to report on one screen

The traceability screen starts from the proposal and shows the linked contract, work orders, samples, parameters and reports.

Sample timeline

The sample's events, such as sampling, receipt, analysis, review and signature, appear in order on its timeline.

History of each result

When a result is changed, the history keeps the previous value, the new value, the author and the date.

Traceability by analytical batch

Beyond the sample, you can look up the batch: how many samples, which parameters and the status of each one.

Reagents, consumables and equipment

The reagent lots, consumables and equipment used are linked to the work order and the result. This helps locate the affected samples when one of them has a problem.

Audit trail

The trail records who did what and when in changes to the main records and results, as well as system access.

The trail covers the monitored records and logins, not all system data. Entries older than 5 years can be purged according to the setup, and protection also depends on database access control.

Three concepts that are not the same thing

Sample traceability, record integrity and metrological traceability answer different questions.

Sample traceability

Shows where the sample has been, from request to report, and who acted at each stage. It is the focus of this page.

Record integrity

The audit trail only adds records, without editing earlier ones, with a minimum retention of 5 years. Protection also depends on access control to the database.

Metrological traceability

Links measurements to standards through calibration certificates and reference materials. It is handled in the equipment module of quality management, and the laboratory documents the chain.

Frequently asked questions

Can I see a sample's history on one screen?

Yes. Traceability starts from the proposal and shows the linked contract, work orders, samples, parameters and reports, and each sample has its own timeline.

What happens when someone changes a result?

The history keeps the previous value, the new value, who changed it and when. The content of records and the reasons for changes are the laboratory team's responsibility.

Is sample traceability the same as metrological traceability?

No. Sample traceability shows the path of the sample and its records. Metrological traceability links measurements to standards, through calibrations and reference materials, and is documented by the laboratory.

Can I trace a whole analytical batch?

Yes. The batch view shows the samples, the parameters and the status of each one.

Want to see this stage with your laboratory's routine?

Free online demo, about 30 minutes long. Our team adapts the examples to your laboratory's routine.