At audit time, the sample tells its own story
Every sample keeps its trail from collection to signed report, so you never pull results from three different places. Quality control comes out calculated and the signature is ICP-Brasil, to the ISO/IEC 17025 standard. One system, whatever matrix lands on your bench.
The pains we take off your plate
The lab's technical work hits the same critical spots every time. This is where we clear the pains that cost hours, or worse, quietly lose a result.
No sample swapped, from vial to report
It takes one misplaced vial on the bench to wreck the whole run, and it's the kind of mistake nobody sees coming. Here every sample comes in with a unique label read by scanner, moves through without getting lost and leaves documented: the right result goes to the right sample, from intake to disposal. See how each vial becomes a record that defends itself at audit time.
Learn moreWork Orders that lose nothing along the way
Where does that job stand right now? Has it been collected, is the report out, who touched it last? When the answer lives in three people's heads, sooner or later something slips, and it is the client who calls to complain. The Gerencialab Work Order pulls the whole job into one place and moves it through your flow on its own, from scheduling to signature. You open the Work Order and see everything. And when the auditor asks who did what, the answer is already there.
Learn moreInspection and technical intake
A problem caught at the door costs minutes. The same problem found three stages later costs the whole run. Here a sample only enters the analytical queue after passing your check, with the protocol you designed for each sample type.
Learn moreRight results, ready for any audit.
You know what a wrong number costs: the run goes back to the bench, the client questions the report, and the auditor wants to know where it came from. Gerencialab closes that door. The analyst enters what they measured and the result comes out calculated, checked and traceable, from intake to the signed report. You deliver faster, redo less, and walk into the audit with the story of every result ready.
Learn moreStatistical Quality Control
Building a Levey-Jennings chart by hand and judging a Westgard rule by eye is where quality control turns into wasted time and room for error. Here you log the control and the run comes back evaluated: the chart comes out automatically and the system tells you, flat out, whether to accept, warn or reject.
Learn moreNo report leaves without a second look
A wrong result that reaches the client does not come back on its own: it turns into rework, a retraction and a strained relationship. Two-level review is the barrier that holds it. The analyst logs, the reviewer checks, and no report leaves without that sign-off.
Learn moreReports and digital signature
Print, sign with a pen, scan and file is the ritual that loses reports and slows the client down. Here the report comes out of your template, gets an ICP-Brasil digital signature straight onto the PDF and carries a code the client checks alone, with no login at all.
Learn moreTree traceability and audit trail
The most dreaded request at audit is simple: show me this sample's history. When that turns into a hunt across three systems, it turns into lost hours and a cold sweat. Here you click the sample and the whole tree opens: proposal, contract, Work Order, parameters, report, all linked.
Learn moreImport from equipment and spreadsheets
Typing 100 readings off the instrument display is where the decimal place slips and the right number becomes the wrong one. Here you export the result to a file, upload it and the system loads everything. The reading comes in tied to the right sample and to the instrument that measured it.
Learn moreDepth collection (stratified profile)
At the same point, the 0-20cm soil does not tell the same story as the 20-40cm, and dumping it all into one sample erases that difference. Here each layer is a sample with its own depth and its own result, but the layers come together in one consolidated report for the point.
Learn moreFrequently asked questions
Does Gerencialab interface directly with the instrument's serial port, in real time?
Not in the current version. What exists is import of equipment and spreadsheet results by file, plus automatic calculation via the method spreadsheet. We would rather tell the truth about that than promise serial capture we do not deliver.
Can the result be compared against more than one regulation?
Yes. Each sample compares against up to three regulations at once (primary, secondary and tertiary), showing each one's maximum permitted limit next to the result and highlighting non-conforming values in red.
Which quality control rules are ready?
Levey-Jennings chart, the six Westgard rules (1-2s, 1-3s, 2-2s, R-4s, 4-1s, 10x), CUSUM (ISO 7870-4) and EWMA (ISO 7870-6). Plus CRMs with validity control and holding times per parameter and matrix.
Is the report signature legally valid?
Yes. It is an ICP-Brasil digital signature with an A1 certificate, applied straight onto the PDF, with a signature stamp and a public portal validation code for the client to verify.
How does sample cancellation work?
In two stages. The operator requests it with a reason, the supervisor confirms with a password. While pending, it can be reverted. Nothing disappears without a double check.
Is it fit for an ISO/IEC 17025 accredited lab?
That is what it was built for. Accredited scopes, statistical quality control, equipment and calibration control, tree traceability, audit trail and ALCOA+ principles. Native compliance, no add-on.
Want to see the LIMS running with your lab's routine?
Book a demo and see it with your own data: the sample comes in by scanner, the QC comes back evaluated, the report comes out signed. No promises, you watch it work.
